Development and maintenance study of the parking areas and traffic lanes of the north access to the port of JORF LASFAR

Development and maintenance study of the parking areas and traffic lanes of the north access to the port of JORF LASFAR

LNG STATION composed of:
• A reinforced concrete operating platform, 25.0 m wide and 40.0 m long, founded on 28 reinforced concrete piles of
1.2m in diameter.
• A berthing system made up of 4 reinforced concrete dolphins of 10.0 m x 10.0 m founded on 9 piles of 1.5 m up to the level
-29.0.
HYDROCARBON STATIONS composed of:
Stations 1 and 2:
• The docking system for berths 1 and 2 is formed by 4 dolphins founded on 12 reinforced concrete piles of 1.5 m up to the
level -34 for the position.
• The operations platform for stations 1 and 2 are 32 m wide and 40.0 m long, and are based on 31
reinforced concrete piles.
Items 3 and 4:
• The docking system for berths 3 and 4 is formed by 4 dolphins founded on 9 reinforced concrete piles of 1.5 m.
• The operating platforms for posts 3 and 4 are 24.70 m wide and have 4 rows of piles (for a total
of 24 piles)

Adresse Agdal :
38 Rue Jabal Oukaïmeden Appt N°13 Agdal Rabat, Maroc


Adresse Hay Riad :
N°C Résidence Al Arz Avenue Al Arz Hay Riad Rabat, Maroc

+212 537 67 45 57
+212 537 67 58 88

contact@mdcing.com