



Development and maintenance study of the parking areas and traffic lanes of the north access to the port of JORF LASFAR
LNG STATION composed of:
• A reinforced concrete operating platform, 25.0 m wide and 40.0 m long, founded on 28 reinforced concrete piles of
1.2m in diameter.
• A berthing system made up of 4 reinforced concrete dolphins of 10.0 m x 10.0 m founded on 9 piles of 1.5 m up to the level
-29.0.
HYDROCARBON STATIONS composed of:
Stations 1 and 2:
• The docking system for berths 1 and 2 is formed by 4 dolphins founded on 12 reinforced concrete piles of 1.5 m up to the
level -34 for the position.
• The operations platform for stations 1 and 2 are 32 m wide and 40.0 m long, and are based on 31
reinforced concrete piles.
Items 3 and 4:
• The docking system for berths 3 and 4 is formed by 4 dolphins founded on 9 reinforced concrete piles of 1.5 m.
• The operating platforms for posts 3 and 4 are 24.70 m wide and have 4 rows of piles (for a total
of 24 piles)
Adresse Agdal :
38 Rue Jabal Oukaïmeden Appt N°13 Agdal Rabat, Maroc
Adresse Hay Riad :
N°C Résidence Al Arz Avenue Al Arz Hay Riad Rabat, Maroc
+212 537 67 45 57
+212 537 67 58 88
contact@mdcing.com